Skip redundant pieces

The Library Annex: Facility Planning

(This project was completed in 2006. These pages are historical documents that are no longer being updated.)

Annex Publicity
  • Publicity about the new Annex

  • Library Space Planning
  • Watson Space Management (2005)
  • Watson Reconfiguration Task Force Report (2002)

  • The Facility
  • Floor Plans/Architect's Drawings
  • Building Specifications
  • Design and Construction Collaborators

  • Universities with off-site storage facilities
  • Annex Home | Services | Collections | Facility | Annex Request | FAQs